Home
Map Approval Procedure PDF Print E-mail
Application can be made on Form A1, A2 duly signed by allottee/transferee, CDA’s approved architect and structural engineer alongwith the following documents:

Application can be made on Form A1, A2 duly signed by allottee/transferee, CDA’s approved architect and structural engineer alongwith the following documents:
 
• 5 (five) copies of building plans Architectural & Structural drawings (on separate sheets).
• Structural design calculations.
• Filled-in Form A1, A2
• Indemnity Bond on Rs. 30/- Stamp Paper.
• Certificate of soundness & stability from Structural Engineer
• Undertaking on Rs. 5/- Stamp Paper for safety of adjacent side walls during construction of Basement.
• Scrutiny Fee (Approval & Completion) as under
         - Scrutiny fee @ Rs. 3 per Sft of proposed covered area or Rs. 5000, whichever is more for residential building.
         - Scrutiny fee @ Rs. 10 per Sft of proposed covered area or Rs. 15000, whichever is more for Commercial building.
• Copy of National Identity Card of Allottee or Transferee or Attorney as the case may be.
• Copy of Allotment letter or Transfer Letter.
• Copy of Possession Certificate (Site Plan).
• Copy of acceptance of Attorney, if applicable.

Certificate required on Drawings / Building Plans

• The structure of this building has been designed by the undersigned.
• The design corresponds to the bearing capacity of the soil at this Site.
• The design caters for seismic requirements of the Islamabad Region.
• Soundness and Stability of the structure is Certified.

Requirements for issuance of completion certificate and process to apply.

Application can be made on Form B1, B2 duly signed by the allottee/transferee, approved architect and structural engineer along with the following documents.

• Filled-in Form B1, B2 along with 5 (five) copies of completion plan as per actual construction at site.
• Copy of N.I.C of Allottee or Transferee.
• Completion Scrutiny Fee as per rates of approval of building plans.

 
< Prev

Al-Khalid Mosque



With the grace of Almighty Allah, Al-Khalid Mosque is almost complete. Management and Residents of Margala View are grateful to

Construction of Model School started by Federal Directorate of Education

Federal Directorate of Education has started construction of the Model School and the contractor aims to complete it by the end of this year.

Model School Approved by the Federal Directorate of Education

Possession has been handed over to the Federal Directorate of Education after Twin City Housing (Pvt) Ltd. Donated 8 Kanals of Land to the Directorate as a gift from the residents of MVHS.

Decent Home Construction picks pace

Decent Homes a well renowned Construction Firm

More than 100 Homes being constructed

Construction activities in full swing with more than 100 houses and 6 plazas under construction or completed.

Gallery Updated

Please visit the D-17 Gallery to see the latest Development Pictures

Mosque Layout

Mosque layout has been completed in Block B and construction will start inshallah at the end of this month

Block B - Electricity

Electricity will be available at the end of this month in Block B
More:
New Gallery

CDA NOC Letter

CDA/PLW-UP-(90)93/131

For More Info Please Visit the CDA Website

Click Here

Weather Forecast

Islamabad  28°C

Who's Online

We have 5 guests online

Subscribe to our News Letter