The Master Plan of MVHS, which is spread over an area of 2000 Kanals, has been approved by the Capital Development Authority Vide CDA Letter No. CDA/PLW-UP-(90)93/131.
According to the approved Master Plan, only 45% area of MVHS is under plots, while 55% is under Roads, Parks/Open Spaces and Community Buildings.
A central water supply system with overhead and underground water reservoirs have been constructed for the project. A separate connection shall be provided to each house.
A sewerage network has been laid, with separate manholes for every two houses along both sides of roads/streets to avoid road cutting. The system has been connected to the sewage treatment Plant, in conformity with the standards of WHO/NEQS.
Electric Power and Sui Gas are available in the vicinity. Underground cable system has been laid to ensure beauty of roads, safe dependable and maintenance friendly power supply to the scheme.
None of the street is less than 40 ft. wide. Asphalt Concrete Machine Carpeted rods/street, designed as per American Standards, has been constructed for the project.
All the buildings in the scheme shall be constructed as per CDA Building Control Regulation. |