Specifications PDF Print E-mail
The Master Plan of MVHS, which is spread over an area of 2000 Kanals, has been approved by the Capital Development Authority Vide CDA Letter No. CDA/PLW-UP-(90)93/131.

According to the approved Master Plan, only 45% area of MVHS is under plots, while 55% is under Roads, Parks/Open Spaces and Community Buildings.

A central water supply system with overhead and underground water reservoirs have been constructed for the project. A separate connection shall be provided to each house.

A sewerage network has been laid, with separate manholes for every two houses along both sides of roads/streets to avoid road cutting. The system has been connected to the sewage treatment Plant, in conformity with the standards of WHO/NEQS.

Electric Power and Sui Gas are available in the vicinity. Underground cable system has been laid to ensure beauty of roads, safe dependable and maintenance friendly power supply to the scheme.

None of the street is less than 40 ft. wide. Asphalt Concrete Machine Carpeted rods/street, designed as per American Standards, has been constructed for the project.

All the buildings in the scheme shall be constructed as per CDA Building Control Regulation.

 
< Prev   Next >

Al-Khalid Mosque



With the grace of Almighty Allah, Al-Khalid Mosque is almost complete. Management and Residents of Margala View are grateful to

Construction of Model School started by Federal Directorate of Education

Federal Directorate of Education has started construction of the Model School and the contractor aims to complete it by the end of this year.

Model School Approved by the Federal Directorate of Education

Possession has been handed over to the Federal Directorate of Education after Twin City Housing (Pvt) Ltd. Donated 8 Kanals of Land to the Directorate as a gift from the residents of MVHS.

Decent Home Construction picks pace

Decent Homes a well renowned Construction Firm

More than 100 Homes being constructed

Construction activities in full swing with more than 100 houses and 6 plazas under construction or completed.

Gallery Updated

Please visit the D-17 Gallery to see the latest Development Pictures

Mosque Layout

Mosque layout has been completed in Block B and construction will start inshallah at the end of this month

Block B - Electricity

Electricity will be available at the end of this month in Block B
More:
New Gallery

CDA NOC Letter

CDA/PLW-UP-(90)93/131

For More Info Please Visit the CDA Website

Click Here